Design Data

Design Data

Treatment Design Data Read more

Documents and Forms

Documents and Forms

Click the links below to download. Developer Guide Petition for Inclusion As-built Submittal Guide Waste Water Discharge Questionnaire Subdivision Public Improvement Agreement Bill of Sale and Agreement Specifications and Regulations Manual Read more

Treatment Facility

Treatment Facility

This summarizes key elements of the treatment process, equipment selection and facility layout. The treatment facility uses the extended aeration activated sludge process. Unit processes include: Read more

Developer Guide

Developer Guide

Items required before commencement of construction, Pre-Construction Requirements, and Post-Construction Requirements.  Items Required Before Commencement of Sanitary Construction: Three (3) copies of approved construction documents. Confirmation of required pre-construction submittals to include SPIA... Read more

Collection System

Collection System

The Fountain Sanitation District owns, operates and maintains approximately 80 miles of sanitary main lines throughout the District, including 3 pumping stations. Main lines range in size from 8" serving... Read more

Design Criteria

Design Criteria

The treatment process is designed on the basis of the influent characteristics and effluent requirements listed below. Design flows and loadings were developed in detail in the Preliminary Engineering Study... Read more

Specifications and Regulations Manual

Specifications and Regulations Manual

Download the Specifications and regulations manual here. Section   Description TOC Table of Contents Part A Sewer Use Regulations Part B Design Criteria and Construction Specifications- Wastewater Collection System Standard Specifications Part C Design Criteria and Construction Specifications- Earthwork Standard Specifications Part... Read more

Information

View the 2017 Special District Transparency Notice
Special District Transparency Notice
Request for Inspection of Public Records
Public Records Request Form
Sanitary Sewer Backup and Drain Policy

It is policy of the Fountain Sanitation District concerning sanitary sewer and drain backups 
that any and all claims arising from sanitary sewer and drain backups will be denied 
unless there is proven negligence on the part of the District.

Emergencies

In the event that you should have a sanitary sewer emergency after hours and need to contact someone immediately, please call the main number for the District offices at 382-5303, phones are transferred to the after-hours personnel on call. In the event the on call personnel cannot be reached, please call the City of Fountain Police Department at 382-8555. They will be able to reach the next available personnel on call.